see the attachment very will.
The objective of the project is to inestigate the practical side of scheduling theory. This can be achieved in one of the following ways.
Project ideas:
- Consider the dynamic single machine problem with various number of jobs and an objective of minimizing two measures; for example, the number of tardy jobs as a primary objective and the total tardiness as a secondary objective.Another example, the total earliness and the total tardiness. Compare different dispatching rules in relation to the objective function using experimental data.
- Consider using Risk solver to compare the performance of the three huristics (Palmer, CDC, Dannenbring) for solving the flowshop problem under various problem sizes, ( number of jobs and number of machines) under various processing time distributions.
- Consider optimizing the parameters of the evolutionary solver in solving the single machine the total tardiness problem. Optimize with respect to the efficiency and quality of the answer.
Alternative:
You may change the problem in terms of the structure, the assumptions, or the objective function.