Work breakdown structure

0 comments

Project: clean up a contaminated site

Scope

develop construction drawings and specifications

obtaining relevant permits from local authorities

Clean up

excavating the contaminated soil

treating it

Putting geotextile

request bids from subcontractors for that phase

two months for the liner to be put in

Replacing soil

Capped with concrete

landscape the edges with trees and shrubbery.

A WBS of the tasks that must be accomplished to complete this project. Pick one activity on level 2 and decompose it so that the lowest level activities meet the six completion criteria.oA project schedule – network diagram, Gnatt chart, etc (or some combination). Estimate the length of time for each major activity; the important issue is parallel versus sequential tasks. (In MS Project the schedule and WBS are linked and you can submit them as one item but you will likely develop these two items in stages.)

About the Author

Follow me


{"email":"Email address invalid","url":"Website address invalid","required":"Required field missing"}