This assignment is to evaluate a project quality based on:
• Volume Metrics: Lines of Code, Number of Files/functions/Variables.
• Object Oriented: CK Metrics.
Peter Drucker, a famous management consultant, states: “If you can’t measure it, you can’t
manage it”. It may not be possible for a project team to successfully manage a project if they
are not able to accurately measure all the aspects of that project. Metrics have played a vital
role in software industries and, as a result, failure rate of software project has decreased
considerably due to the use of software project management tools and techniques. Nowadays,
more efficient, robust and quantitative measures for effective software requirement, analysis,
design, development, quality assurance, integration, deployment and support are in practice.
The quality of software system should be measured during each phase of software system
development.
In this context, CK-Metric suite is an initiative to examine the various aspect of object
oriented system design such as size, coupling, cohesion and inheritance. Th
use understand tool and then excel

0 comments