• Home
  • Blog
  • University of Houston Developing the Work Breakdown Structure Lab Report

University of Houston Developing the Work Breakdown Structure Lab Report

0 comments

need predecessors and duration added for the kitchen part only and fix the verbiage in the highlighted part

Part 2 – Developing the Work Breakdown Structure

undefined

Develop a work breakdown structure (WBS) for your project based on the first project assignment. The process is as follows:

undefined

  • Create a detailed list of the components of the project, through work packages, tasks, and subtasks. Use the intended scope of the project to help you determine all the project components.
  • Determine the resource needs for the project (i.e., personnel, facilities, and equipment).
  • Determine the relationships between the project components and the people. For example, for each component, at least one person will be responsible for its completion, while others may be involved as consultants or decision approvers.

undefined

EXAMPLE WORK BREAKDOWN STRUCTURE

undefined

ABBREVIATED PERSONNEL TABLE

undefined

Name

Department

Title

Joe Evans

Accounting

Bid Manager

Sim Elezar

Projects

Project Manager

Kim Astair

Engineering

Systems Architect

Leo Biel

Operations

Operations Manager

Tara Simmons

Operations

Logistics Manager

undefined

NOTE: If you do not have names, you can identify the personnel by job such as Master Plumber, Journeyman Electrician #3, etc.

undefined

ABBREVIATED SAMPLE WORK BREAKDOWN STRUCTURE

undefined

WBS

1

Improvement Project

Main Project

1.1

Deliverable 1: Bid response time

Deliverable 1

1.1.1

Map current bid process

Work Package

1.1.1.1

Interview bid team

Task

1.1.1.2

List bid steps and process relationships

Task

1.1.2

Conduct value-added process study

Work Package

1.1.2.1

Determine value added by each process step

Task

1.1.2.2

Separate process steps into necessary vs. unnecessary

Task

1.1.3

Reform process to eliminate unnecessary and non-value-added steps

Work Package

1.1.3.1

Pare down to only necessary and value-added steps

Task

1.1.3.2

Identify ways to improve and shorten remaining steps

Task

1.1.3.3

Create new process map

Task

1.2

Deliverable 2: Increase customer response rate

Deliverable 2

1.2.1

Interview customers

Work Package

1.2.1.1

Create survey

Task

1.2.1.2

Find non-responsive and responsive customers

Task

1.2.1.3

Deliver survey

Task

1.2.2

Analyze removing response rate barriers

Work Package

1.2.2.1

List primary reasons for low response

Task

1.2.2.2

Order reasons for priority/feasibility

Task

1.2.3

Implement new measures

Work Package

1.3

Deliverable 3: Reduce bid complaints and calls

Deliverable 3

1.3.1

Interview customers

Work Package

1.3.1.1

Create survey

Task

1.3.1.2

Find unhappy customers

Task

1.3.1.3

Deliver survey

Task

1.3.2

Analyze resolving complaint root causes

Work Package

1.3.2.1

List primary reasons for bid complaints

Task

1.3.2.2

Order reasons for priority/feasibility

Task

1.3.3

Implement new measures

Work Package

1.4

Deliverable 4: Decrease bid package size and complexity

Deliverable 4

1.4.1

Interview customers

Work Package

1.4.1.1

Create survey

Task

1.4.1.2

Identify customers with bid size complaints

Task

1.4.1.3

Deliver survey

Task

1.4.2

Determine appropriate bid content

Work Package

1.4.3

Implement new bid construction process

Work Package

1.5

Deliverable 5: Increase customer contract sign rate

Deliverable 5

1.5.1

Identify existing market bids

Work Package

1.5.1.1

Benchmark market leaders

Task

1.5.1.2

Analyze price ranges

Task

1.5.1.3

Analyze bid features

Task

1.5.2

Normalize bid features and ranges to market expectations

Work Package

1.5.2.1

Identify target market

Task

1.5.2.2

Match bid creation process to intended market

Task

undefined

NOTE: Instead of the diagram above, you can simply copy and paste your Microsoft project view obtained by inputting all tasks, indenting as necessary, and inserting the column WBS for the coding/numbering. The WBS does NOT include any dates, predecessors or durations. These are aspects of scheduling while the WBS is simply a breakdown of all aspects of the project deliverables.

undefined

Example Responsibility Matrix

undefined

The example above can be modified using letters and/or numbers instead of the symbols give. You must, however, explain what it means to be responsible, to support, etc. Also, given the extensive nature of your real-world project, your list of work packages (WP) and the personnel involved will be much more detailed. Instead of the names of people, you may use your resource job description, such as master plumber, journeyman electrician, etc. Again, you can copy from your Microsoft Project’s Gantt chart/input view at the work package/tasks level. Do not assign resources to the sub-deliverables (those in bold lettering).

undefined

Part 4 – Developing the Project Schedule

undefined

Before you start your input, you need to specify the holidays/non-working days in your project. You must also specify the working times for the project. Default is Monday-Friday from 8-12 and 1-5. In construction, for example, this may not make sense. You can set different working days for a specific resource once that resource is entered in Part 5. You can also, set different working times for any resource or group of resources once they are entered. For this section, state your working times and add predecessors and durations for each activity (not sub-deliverables!) in your WBS from Part 2. Everything is not “1 day”! And if something is one day, be sure to remove the default “?” from that duration entry. You can change your project start date using Project tab and you can change the default from days. If something takes only a couple of hours, then type in “2 hrs” and MS Project will convert this into fractions of a day (if that “days” is your project default).

undefined

The scheduling output includes the Gantt Chart view clearly showing durations, times and beginning/ending dates with the Gantt chart, the network diagram (or Tracking Gantt), and a statement of the critical path. Remember that if you group by critical, you get a list of the critical activities but these may be on multiple paths. You MUST check your network and/or tracking Gantt to identify the critical path(s)! Also, a critical path is a statement of the activities, not the line numbers or an alphabetic identifier.

About the Author

Follow me


{"email":"Email address invalid","url":"Website address invalid","required":"Required field missing"}