Please I want someone have On screen take off or blue beam and to be expert in reading plans and the answers needs to be in excel spreadsheet

Perform quantity take off for rebar and concrete between Lines 1-3 and A-C (Include entry at 1.5 & C)

Reinforcing (pounds)
1, Foundations
2, Slab
3. Masonry (up to the 2nd floor level)

Convert each to pounds per SF of building slab area

Concrete (CY)
1, Foundations
2, Slab

Convert each to CY per SF of building slab area

Show the resultant pounds of rebar per CY of Concrete

From your calculations, develop the total building quantities to be inserted into the structural tab of our spreadsheet. Identify the total quantity of reinforcing (LBS) and volume of concrete (CY) for the building slab/foundation.