• Home
  • Blog
  • NA18 – IT Management sessioon 2 N

NA18 – IT Management sessioon 2 N

0 comments

Hello,

Please answer below discussion and research paper

Session 2 – Discussion

Assignment Part 1

Topic: PMI Methods and Project Initiation, Supporting the Triple Constraint with Key Knowledge Areas, and Understanding Project Failures

DQ3:(350 words)

How has the triple constraint concept changed over time? Is there a space for the triple constraint in the agile project methodology? Discuss your answer in greater detail and list at least a few references at the end of your work to show where you found this information.

=======================================================================

Session 2 : concept paper

Assignment Part 2

Conduct research on software project issues and failures in both waterfall and agile methodologies. Compare/contrast these concepts. Include a discussion on ways to ensure the same types of issues and failures do not occur again for future projects. Consider a section discussing how AI may change the way that project issues or failures are addressed in the future. This paper should be approximately 5-7 pages in length (including cover and references pages). There should be at least four references to scholarly and/or professional articles/journals.

Please follow the below instructions and Project should be as given format(5-7 Pages)

NOTE :: Required materials attached below and OUTLINE instructions given below

OUTLINE

About the Author

Follow me


{"email":"Email address invalid","url":"Website address invalid","required":"Required field missing"}