MS Project #1

0 comments

Total Points: 100 Instructions:

  • Update your MS Project file based on any feedback given last week. (Points can be lost for not updating previously submitted assignment)
  • Break down the Work Packages into the Activities necessary to create the deliverables. (You should have a minimum of approximately 40 activity tasks; also, remember to use the Verb / Adj. / Noun format in naming activities; all activities must begin with an action verb (Examples: create, order, schedule, build, code, etc…)) Activities are the actions you will take to create the deliverables. Please see example below:
    • 1.1 Kitchen Cabinets (Deliverable)
    • 1.1.2 Request Kitchen Cabinet Bids
    • 1.1.3 Approve Kitchen Cabinet Contract
    • 1.1.4 Install Kitchen Cabinets
  • Enter estimated durations for each activity created (keep resources in mind, but do not assign resources)
  • If effort and duration differ, adjust the task type and effort to account for difference (see this week’s lecture for a discussion on this issue). Failure to do this will lead to loss of credit.
  • Create at least 12 activity notes that contain the following information:
    • 1) Estimating method used (bottom-up, top-down, etc.),
    • 2) basis of estimate (past experience, SME, vendor quote, etc.)
    • 3) one or two reasons why actual duration may vary from estimated duration
  • Add at least four milestones to your project (place milestones at key points throughout project; make milestones ‘red’ to show where they are)

Requirements:

  • Use MS Project to complete your assignment.
  • Save your files using the following filename convention:
    • MSProject1 – FirstName_LastName

Be sure to read the criteria, by which your paper/project will be evaluated, before you write, and again after you write.

Evaluation Rubric for Unit 2: MS Project #1 Assignment

CRITERIADeficientNeeds ImprovementProficientExemplary
 0 – 15 Points16 – 19 Points20 – 24 Points25 Points
Work Breakdown StructureWork Packages are not fully decomposed but less than the 30 Activities necessary to create the deliverables. Some of the correct naming conventions are missing.Work Packages are fully decomposed but less than the 40 Activities necessary to create the deliverables. Some of the correct naming conventions are missing.Work Packages are fully decomposed into the 40 Activities necessary to create the deliverables. Some of the correct naming conventions are missing.Work Packages are fully decomposed into the 40 Activities necessary to create the deliverables. Correct naming conventions are used.
EstimateWork Packages areWork Packages areWork Packages areWork Packages are
Durationsfully decomposed and activities arefully decomposed into the less than 40fully decomposed into the 40fully decomposed into the 40 Activities
 less than 40Activities necessary toActivities necessarynecessary to create
 Activities necessarycreate theto create thethe deliverables. Each
 to create thedeliverables. Some ofdeliverables. Eachof the activities have
 deliverables. Somethe activities have anof the activitiesan assigned duration
 of the activitiesassigned duration buthave an assignedwith contingencies.
 have an assignednot all activities haveduration but not all 
 duration but not allcontingencies.activities have 
 activities have contingencies. 
 contingencies.   
EstimateBetween 2 to 5Between 6 to 10At least 10 activityAt least 12 activity
Methodsactivity notes that contain theactivity notes that contain the followingnotes that contain the followingnotes that contain the following information:
 followinginformation: 1)information: 1)1) Estimating method
 information: 1)Estimating methodEstimating methodused (bottom-up, top-
 Estimating methodused (bottom-up, top-used (bottom-up,down, etc.), 2) basis of
 used (bottom-up,down, etc.), 2) basis oftop-down, etc.), 2)estimate (past
 top-down, etc.), 2)estimate (pastbasis of estimateexperience, SME,
 basis of estimateexperience, SME,(past experience,vendor quote, etc.),
 (past experience,vendor quote, etc.),SME, vendorand 3) one or two
 SME, vendorand 3) one or twoquote, etc.), and 3)reasons why actual
 quote, etc.), and 3)reasons why actualone or two reasonsduration may vary
 one or two reasonsduration may varywhy actual durationfrom estimated
 why actual durationfrom estimatedmay vary fromduration.
 may vary fromduration.estimated duration. 
 estimated duration.   
 0 – 11 Points12 – 15 Points16 – 19 Points20 Points
MilestonesAt least 2 milestones to yourAt least three milestones to yourAt least three milestones to yourAt least four milestones to your
 project areproject are identifiedproject areproject are identified
 identified and someand some are notidentified andand marked red.
 are not marked red.marked red.marked red. 
 0 Points1 – 2 Points3 – 4 Points5 Points
Clear andWriting assignmentWriting assignmentWriting assignmentWriting assignment is
Professional Writingcontains no sense of organization. Paragraphs lackcontains a sense of organization. Some paragraphs have clearcontains good overall organization. Mostwell-planned and well- thought out. All paragraphs have clear
 clear ideas.ideas. Containsparagraphs haveideas, are supported
 Contains severalseveral minor errors inclear ideas and arewith examples and
 errors in grammar,grammar, spelling andsupported withhave smooth
 spelling andpunctuation, but doessome examples.transitions.
 punctuation whichnot detract fromMostly free ofFree of errors in
 detracts fromcontent of theerrors in grammar,grammar, spelling and
 content of thepassage.spelling andpunctuation.
 passage. punctuation. 