• Home
  • Blog
  • Monitoring and Controlling Risk – Project Management

Monitoring and Controlling Risk – Project Management

0 comments

Assignment Brief

The management of risk is proving to be one of the most difficult tasks for the
project management profession. How can risk be managed effectively and who
should be responsible for this task?

You are required to critically analyse the concept of risk; discuss how it can be
measured and ranked and outline how a project risk management strategy may
be constructed for a project of your own conception. In completing this
assignment, you should address how appropriate practices can assist in
minimising risk for your project.

Marking Scheme
Criteria Marks

Use of theory 30

Examples 30

Quality of argument 10

Reference to course ideas 10

Citation and References 10

Conclusions 10

This is an individual assessment worth 50% of the module mark. Word length 3000 words (do not exceed word limit). Do not include the cover page, abstract, table of contents or References section in the word count.

Your paper should have a clear structure, with:

– a cover page (student number, module title, assignment title, word count (effective, not max), declaration of originality
– an abstract (300 words max, one single paragraph)
– a table of contents
– the main body of the paper – you have full creative control over the structure, but do use section headings to signpost your work
– references list – this is mandatory at Master level

Task:
Download the PDF file which contains full details for the task as well as marking criteria and marking grid.

Deadline: 17 Feb 2019 23:59 (Zurich time).

This assignment is graded. (50% of overall grade)

About the Author

Follow me


{"email":"Email address invalid","url":"Website address invalid","required":"Required field missing"}