 CLASS PROJECT

 

THE ENCLOSED PROJECT INCLUDES TWO CASE STUDIES.  BOTH CASES

MUST BE COMPLETED FOR FULL CREDIT ON THIS PROJECT.  FOR EACH

CASE, YOUR WRITEUP SHOULD INCLUDE A BRIEF SUMMARY OF THE CASE,

A DISCUSSION OF THE TECHNIQUES USED TO SOLVE THE CASE, ANY 

COMPUTATIONS AS APPROPRIATE, AND A BRIEF SUMMARY OF RESULTS.

REMEMBER THAT BOTH CASES MUST BE COMPLETED FOR FULL CREDIT!!!!

 

10 PTS. CASE I –  THE BURBANK POTATO COMPANY

 

THE QUALITY CONTROL MANAGER OF THE BURBANK POTATO COMPANY,

WILLY ARBUCKLE, IS CONCERNED ABOUT ADHERENCE TO WEIGHT REQUIRE-

MENTS OF BAGS OF POTATOES THAT THE COMPANY IS PRODUCING 

AND DISTRIBUTING TO SUPERMARKETS.  ACCORDING TO COMPANY REGULA-

TIONS, THE WEIGHT OF EACH BAG OF POTATOES SHOULD BE BETWEEN

12.00 AND 19.00 LBS. OF WEIGHT.  THE Q.C. MANAGER HAS TAKEN 30

SAMPLES OF 6 BAGS EACH WITH WEIGHTS AS SHOWN AND RECORDED IN THE 

TABLE BELOW.  THE QUALITY CONTROL MANAGER HAS DECIDED TO DEVELOP 

AN X-BAR CHART AND AN R CHART IN ORDER TO DETERMINE IF THE WEIGHT 

OF THE BAGS OF POTATOES IS IN CONTROL.

 

THE Q.C. MANAGER WISHES TO DETERMINE THE FOLLOWING:   

              _  

A) DEVELOP AN X QUALITY CONTROL CHART.  PERFORM WHATEVER CALC-

ULATIONS ARE NECESSARY TO DETERMINE THE VALUES PLOTTED IN THE

CHART.  FROM YOUR PLOT, DOES THE PROCESS APPEAR TO BE IN 

CONTROL?  MAKE SURE TO PLOT UCL AND LCL LINES AND PLOT THE

POINTS ON YOUR CHART!!!!!

              

B) DEVELOP AN R QUALITY CONTROL CHART.  FROM YOUR CHART, DOES

THE PROCESS APPEAR TO BE IN CONTROL?  MAKE SURE TO PLOT YOUR

UCL AND LCL LINES AND PLOT YOUR POINTS ON YOUR CHART!!!!!!

 

IN PARTS (A) AND (B) ABOVE, MAKE SURE TO SHOW YOUR CALCLULAT-

IONS FOR UPPER AND LOWER CONTROL LIMITS.  USE THE APPROPRIATE

TABLES FROM THE CLASS HANDOUTS IN ORDER TO OBTAIN YOUR LIMITS.  

 

C) USE THE “RUNS ABOVE AND BELOW THE MEDIAN” AND THE “RUNS UP

AND DOWN” TESTS TO DETERMINE WHETHER THERE IS ANY UNDERLYING

PATTERN IN YOUR DATA.  SHOW YOUR CALCULATIONS FOR THIS.  USE

A TEST WITHIN 3 STANDARD DEVIATIONS.

 

D) BASED ON YOUR RESULTS IN PART (C) ABOVE, DO YOU BELIEVE

THERE IS THE LIKELIHOOD OF THE PROCESS BEING OUT OF CONTROL

IN THE FUTURE?  EXPLAIN YOUR REASONING.  (HINT: IF YOU DO

NOT PASS BOTH OF THE RUNS TEST, THERE IS A HIGH LIKELIHOOD

OF THE PROCESS GOING OUT OF CONTROL IN THE NEAR FUTURE!!!!)

 

  

 

                          OBSERVATION (WT., LB.)

SAMPLE       1        2        3        4        5        6

 

  1         12.43    12.45    12.41    12.44    12.45    12.46 

  2         12.56    12.56    12.58    12.55    12.58    12.57

  3         12.60    12.62    12.63    12.63    12.65    12.67

  4         12.35    12.38    12.38    12.39    12.35    12.37

  5         12.48    12.48    12.50    12.49    12.46    12.47

  6         12.32    12.34    12.35    12.31    12.35    12.36

  7         12.51    12.51    12.53    12.56    12.57    12.55

  8         12.66    12.64    12.64    12.65    12.65    12.66

  9         12.45    12.47    12.47    12.49    12.50    12.46

 10         12.46    12.48    12.51    12.51    12.49    12.47

 11         12.58    12.58    12.58    12.60    12.57    12.59

 12         12.44    12.44    12.46    12.45    12.48    12.44

 13         12.56    12.58    12.59    12.56    12.55    12.55

 14         12.54    12.53    12.52    12.54    12.54    12.55

 15         12.60    12.62    12.61    12.63    12.62    12.61

 16         12.63    12.63    12.65    12.65    12.64    12.63

 17         13.21    13.44    13.25    13.21    13.12    13.33

 18         13.11    13.35    13.52    13.27    13.53    13.41

 19         13.64    13.27    13.48    13.66    13.34    13.22

 20         13.01    13.44    13.29    13.28    13.26    13.46

 21         13.23    13.32    13.20    13.25    13.31    13.23

 22         13.11    13.26    13.51    13.27    13.31    13.44          

 23         14.33    14.01    14.89    14.67    14.55    14.62

 24         14.78    14.88    14,38    14,99    14,98    14,90

 25         15.01    15.32    15.77    15.26    15.81    15.75

 26         15.98    16.00    16.11    16.23    16.21    16.07 

 27         16.01    15.88    16.34    16.78    16.54    16.38

 28         16.66    16.82    16.99    17.04    17.33    17.49

 29         17.21    17.25    17.44    17.58    17.18    17.68

 30         17.62    17.96    17.82    18.04    18,20    18.32 

 

 

 

 

 

 

10 PTS. CASE II – THE ALPHA-ONE CELL PHONE COMPANY RETURNS

THE OPERATIONS MANAGER OF THE ALPHA-ONE CELL PHONE COMPANY

WISHES TO DETERMINE IF THERE HAS BEEN ANY IMPACT OF RETURNS

OF CELL PHONES SINCE THEY HAVE ESTABLISHED A POLICY OF NOT

CHARGING CUSTOMERS A DISCONNECT FEE FOR TERMINATING SERVICE.

THE MANAGER HAS MAINTAINED DATA REGARDING THE NUMBER OF PHONES

RETURNED OVER THE LAST 48 WEEKS.  THE MANAGER WISHES TO DETER-

MINE IF THE PROCESS OF PHONE RETURNS IS IN CONTROL.  THE DATA

COLLECTED IS AS SHOWN BELOW:

 

         

WEEK      1     2     3     4      5      6      7      8   

 

PHONES   12    14    14    16     16     15     11     12  

RETURNED

 

WEEK      9    10    11    12     13     14     15     16

 

PHONES   13    15    17    17     19     20     17     15   

RETURNED

 

WEEK     17    18    19    20     21     22     23     24

 

PHONES   14    14    16    19     20     22     18     16   

RETURNED

 

WEEK     25    26    27    28     29     30     31     32

 

PHONES   22    25    24    27     29     29     33     35

RETURNED

 

WEEK     33    34    35    36     37     38     39     40

 

PHONES   29    33    34    34     36     38     37     39

RETURNED

 

WEEK     41    42    43    44     45     46     47     48

 

PHONES   38    40    40    42     46     45     49     50 

RETURNED

 

 

THE QUALITY CONTROL MANAGER FOR OPERATIONS WISHES TO PERFORM

THE FOLLOWING ANALYSES:

 

A) CONSTRUCT A C-CHART USING THREE(3)-SIGMA LIMITS FOR THE

PROCESS.  MAKE SURE TO PLOT YOUR POINTS AND TO INCLUDE THE

UCL AND LCL VALUES ON YOUR CHART.  SHOW YOUR CALCULATIONS

FOR THESE VALUES.  

 

B) DOES THE PROCESS APPEAR TO BE IN CONTROL?  EXPLAIN.

 

C) THE Q.C. MANAGER ALSO WISHES TO EXAMINE WHETHER THERE IS

ANY PATTERN IN THE CHART BY DEVELOPING A “RUNS ABOVE AND

BELOW THE MEDIAN” TEST, AND A “RUNS UP-AND-DOWN” TEST.

COMMENT ON YOUR RESULTS FOR THESE!!!!!!!!

 

D) FROM THE RUNS TESTS, DO YOU BELIEVE THERE IS ANY SIGNIF-

ICANT CHANGE IN PHONES RETURNED OVER TIME?  EXPLAIN BRIEFLY.

(HINT: REMEMBER THAT YOU HAVE TO PASS BOTH RUNS TESTS IN

ORDER TO CONCLUDE THAT THERE IS NO SIGNIFICANT PATTERN IN

 

THE RETURNS DATA!!!!)