Material Requirements Planning

0 comments

 750-1,000 Word White Paper; 1,200-1,500 words

 

Utilizing the Step-by-Step MRP Calculation Process, students will solve the following MRP problem given: Product A is an end item and is made from two units of B and four of C. B is made of three units of D and two of E. Product C is made of two units of F and two of E. Product A has a lead-time of one week. Products B, C and E have lead-times of two weeks. Products D and F have a lead-time of three weeks.

 

a. Show the bill of material (product structure tree). b. If 100 units of A are required in week 10, develop the MRP planning schedule, specifying when items are to be ordered and received. There are currently no units of inventory on hand.

Grading Criteria

Percentage

Deliverable requirements addressed; understanding of material and writer’s message and intent are clear.

35%

Scholarly research supports the writer’s position and is properly acknowledged, and cited direct quotations may not exceed 10% of the word count of the body of the assignment deliverable (excluding title page, abstract, table of contents, tables, exhibits, appendices, and reference pages). Inclusion of plagiarized content will not be tolerated and may result in adverse academic consequences.

20%

Critical thinking: Position is well-justified, there is logical flow, and there are examples.

20%

Structure: Includes introduction and conclusion, proper paragraph format, and reads as a polished, academic paper or professional presentation, as appropriate for the required assignment deliverable.

10%

Mechanical: No spelling, grammatical, or punctuation errors.

10%

APA: Deliverable is cited properly according to the APA Publication Manual (6th ed.).

5%