IT425 dic proj

0 comments

Dicussion 5

Primary Discussion Response is due by Friday (11:59:59pm Central), Peer Responses are due by Tuesday (11:59:59pm Central).

Primary Task Response: Within the Discussion Board area, write 400–600 words that respond to the following questions with your thoughts, ideas, and comments. This will be the foundation for future discussions by your classmates. Be substantive and clear, and use examples to reinforce your ideas.

Summative Discussion Board

Review and reflect on the knowledge you have gained from this course. Based on your review and reflection, write at least 3 paragraphs on the following:

  • What were the most compelling topics learned in this course?
  • How did participating in discussions help your understanding of the subject matter? Is anything still unclear that could be clarified?
  • What approaches could have yielded additional valuable information?
  • The main post should include at least 1 reference to research sources, and all sources should be cited using APA format.

Responses to Other Students: Respond to at least 2 of your fellow classmates with a reply of 100–200 words about their Primary Task Response regarding items you found to be compelling and enlightening. To help you with your discussion, please consider the following questions:

  • What did you learn from your classmate’s posting?
  • What additional questions do you have after reading the posting?
  • What clarification do you need regarding the posting?
  • What differences or similarities do you see between your posting and other classmates’ postings?

For assistance with your assignment, please use your text, Web resources, and all course materials.

Ind project part 2

Key Assignment Final Draft

In the previous 4 weeks, you were first asked to select a system or software application to specify requirements, develop a design using modeling tools, formulate development and testing strategies, and propose an integration and deployment plan. Each week, you contributed with specifications and plans that culminated in an overall Key Assignment System Requirements, Design, and Implementation Specification as follows:

Part 1 Tasks (Objectives from Week 1–4)

  • Week 1: System and Application Overview: An overview of the system or software application and intended users
  • Week 1: Requirements Specification: Detailed requirements specification with both functional and nonfunctional requirements
  • Week 2: System and Application Design: A high-level design in the form of use cases and detailed design models utilizing computer-aided software engineering (CASE) tools to represent the data, processes, and interfaces
  • Week 3: Test and Quality Assurance Plan: A test and quality assurance plan that included the various tests and quality control measures that need to be taken into consideration
  • Week 4: Development Strategy: A development strategy that weighs make versus buy or insourcing versus outsourcing acquisition strategies

Make any updates to the first 4 weeks’ content based on feedback from your instructor and your peers. Make sure that the Key Assignment has a good flow and is cohesive in its presentation of information.

Part 2 Tasks (Objectives from Week 5)

In the final week, you are given the assignment to craft an integration and deployment plan for your selected application or system that includes the required resources and work breakdown structure of implementation tasks (you may use Visio Software Application where needed).

The project deliverables are as follows:

  • Update the System Requirements, Design, and Implementation Specification title page with the new date.
  • Update the previously completed sections based on the instructor’s and peers’ review feedback.
  • Integration and Deployment Plan
    • Develop an overall work breakdown structure (WBS) for the 7 system development life cycle (SDLC) phases:
      • Preliminary Analysis
      • System Analysis or Requirements Definition
      • System Design
      • Development
      • Integration and Testing
      • Acceptance, Installation, and Deployment
      • Operation Support and Maintenance
    • Add activities under the first 5 phases that you already performed in Weeks 1–4.
    • Add activities that are specific to the final 2 phases in SDLC for deployment and ongoing maintenance and support.

Part 3 Tasks (Summary Page)

Produce a one page summary to discuss the following two subjects:

  • During the requirements collection stage, how did you gather input and/or feedback from the shareholders who may have different culture background and/or different professional experience to create the final requirements document?
  • Discuss how this project has enabled you to further improve your professional domain knowledge and skills including requirements collecting and analyzing, critical thinking, system design, communication and presentation, etc.
  • Name the document “yourname_IT425_IP5.doc.”

About the Author

Follow me


{"email":"Email address invalid","url":"Website address invalid","required":"Required field missing"}