IP40 Managerial

0 comments

Utilizing the Step-by-Step MRP Calculation Process, students will solve the following MRP problem given: Product A is an end item and is made from two units of B and four of C. B is made of three units of D and two of E. Product C is made of two units of F and two of E. Product A has a lead-time of one week. Products B, C and E have lead-times of two weeks. Products D and F have a lead-time of three weeks.

 

a. Show the bill of material (product structure tree).

b. If 100 units of A are required in week 10, develop the MRP planning schedule, specifying when items are to be ordered and received. There are currently no units of inventory on hand.

 

Grading Criteria:

Student will demonstrate their relevant knowledge of MRP

Apply critical thinking in applying MRP concepts

Create an Master Production Schedule and a Material Requirement Planning Chart

If there is a positive net requirement in a week, backward schedule by the lead-time and enter the quantity for the planned order release that will satisfy the net requirement.

The student applied correct APA, style, usage, grammar, and punctuation.

Describe the concepts of demand management

This assignment will also be assessed using additional criteria provided here:  http://www.leanmanufacturingconcepts.com/PushVsPull.htm

http://www.invatol.com/mrp.html

 

http://www.inventorymanagementreview.org/2005/09/a_simplified_lo.html

About the Author

Follow me


{"email":"Email address invalid","url":"Website address invalid","required":"Required field missing"}