FOR Professor Ryan only

0 comments

Project 3

Assignment Type:

Individual Project

Deliverable Length:

2 pages

Points Possible:

150

Clusters can be implemented by leveraging many operating systems and applications. In a report of 1

–2 pages, complete the following:

Identify an operating system and application combination, and discuss at least 2 cluster

implementation models supported.  

Identify and discuss the advantages and disadvantages of the implementation of the models

you suggested.

Create a diagram showing node and cluster storage placement to represent each design

layout.

• Clearly label the diagram.

Please remember that you should provide proper citations and references for all of your sources

 

Project 4close

 

Assignment Type:

Group Project

 

Deliverable Length:

4–5 pages

 

Points Possible:

200

 

Develop and submit a project plan including implementation steps for the configuration and

 

implementation of a cluster computing solution to support a mission critical application.

 

In a project of 4–5 pages, complete the following:

 

Using the Small Group Discussion Board, summarize the mission critical application (i.e. e-mail, Web,

 

or database services) and the cluster computing model to be implemented. The group’s submission

 

should highlight the following:

 

• How the model that you have selected will minimize downtime and increase performance.

 

Your discussion should include hardware to be used and the implementation strategy you

 

will follow to reduce the single points of failure.

 

 

◦ Identify storage connectivity types (Fiber or Ethernet).

 

◦ Will your implementation leverage shared storage?

 

How have you configured each node to mitigate your risk of having a single point

 

of failure (multiple NIC, HBA cards, internal HD, etc.)?

 

 

◦ Are your node located in same data center, multiple cities etc., and why?

 

• Create a diagram of your cluster implementation. The diagram should depict the following:

 

◦ All nodes of the cluster

 

◦ LAN connection

 

◦ Storage connection points and all redundant connections

 

◦ IP addressing schemes for public and private network connections

 

• Submit 1 project plan per group.

 

Please remember that you should provide proper citations and references for all of your sources

 

 

 

 

 

Project 5close

Assignment Type:

Individual Project

Deliverable Length:

8–10 slides

Points Possible:

150

Management utilities can be vendor-specific or vendor-neutral. There are many utilities that are

available to provide a proactive approach to monitoring each node of the cluster.

Submit a PowerPoint presentation of 8–10 slides that includes the following:

• Identify 1 vendor-specific server-monitoring utility.

• Identify 1 vendor-neutral monitoring utility.

• In your presentation, list advantages and disadvantages of using one or the other.

Your answer should clearly identify what notification and management interfaces each utility has

available (i.e., e-mail enabled, management console, Web-based)

About the Author

Follow me


{"email":"Email address invalid","url":"Website address invalid","required":"Required field missing"}