• Home
  • Blog
  • CS 368T Colorado Technical University Online U5S1 Requirements Management Paper

CS 368T Colorado Technical University Online U5S1 Requirements Management Paper

0 comments

Part 1

Requirements management includes everything required
to maintain the integrity, accuracy, and the correctness of the
requirements throughout the life of the project. You are required to
define the key tasks that you need to do within each of requirements
management category.

Please include 2–4 tasks for each category. Create a similar table to complete this part of the assignment:

Four Categories Tasks
Version Control 1.
2.
3.
4.
Change Control 1.
2.
3.
4.
Requirement status tracking 1.
2.
3.
4.
Requirements tracing 1.
2.
3.
4.

Part 2

Provide an example of a corrective, adaptive, and
perfective change request by a user. Provided examples should be in
context of a system of your choice. With each of the three examples,
explain how you would prioritize the three requirements to be
implemented in relationship to each other.

Answer the question in 3–4 paragraphs. Be sure to include the following:

  • A corrective, adaptive, and perfective change request by a user
  • A system description that is referenced for the change request
  • An example of prioritizing each of the changes in relationship to each other
    • Label each priority as 1, 2, and 3
    • Include an explanation supporting the prioritization

About the Author

Follow me


{"email":"Email address invalid","url":"Website address invalid","required":"Required field missing"}