i have the file that i start i need some one complete
my topic number 8 : 3km_retaining_wall_in_hilly_areas
it open in this website : http://www.gantter.com/
that u will work with it u will see the example
i need the GANTTER + Power point for the work
The report should contain the following tasks
1. Work breakdown structure for the project selected based on the students number. Here
the students have to prepare a comprehensive list of all the activities of the project.
[Weightage: 25%]
2. Schedule the activities as per the logic applied. The scheduling has to be done in
GANTTER using proper logical sequence for all the activities. All possible combinations
of logical sequence can be used to get the optimized time schedule. The entire schedule
has to be printed and submitted in the report.
[Weightage: 35%]
3. Identify the resources and prepare an online resource chart using GANTTER. This table
has to be printed from GANTTER and submitted. All possible resources – Men,
Machinery, Materials and Money has to be incorporated along with their anticipated cost.
[Weightage: 25%]
4. Presentation Slides. The student has to defend their work at the end of the semester and
proper reasoning, justification and conclusion has to be provided.


0 comments