- Weight: 10% of course grade
- Grading Rubric
- Due: Monday, 08/09/2021 11:59 PM (CST)
Instructions
Project Schedule
In this unit, you are required to complete the Project Schedule section of the project plan. Refer to your unit lesson (from this unit and last unit) and required unit resources to advance your project plan. For this assignment, create the components listed below.
- Project Schedule: Include the duration estimates for all project activities, their activity networks, the project critical path, and estimated project duration.
- 4.1 Activity Duration Estimates: Include a table with activity number, activity, predecessors, optimistic duration, most likely duration, pessimistic duration, and estimated duration. Be sure to show your paths as well as the critical path.
- 4.2 Gantt Chart: Show the task, duration, predecessors, and the schedule leveling.
- 4.3 Activity Network: Be sure to include fully completed nodes, including early start, early finish, late start, late finish, and activity float/slack.