• Home
  • Blog
  • Campbellsville Earned Value Project Management Method and Extensions Questions

Campbellsville Earned Value Project Management Method and Extensions Questions

0 comments

  1. Activity I: An activity on the critical path of a project was scheduled to be completed within 12 weeks, with a budget of $8,000. During a performance review, which took place 7 weeks after the activity was initiated, it was found that 50% of the work had already been completed and that the actual cost was $4,500.
    1. Calculate the EV of the activity.
    2. Calculate the CI and SI for the activity.
    3. Calculate the expected BAC using the original estimate approach.
    4. Calculate the expected BAC using the revised estimate approach.
    5. Compare and discuss the results obtained in parts (c) and (d).
    6. Activity II: Identify a new product that is based on an innovation in technology, and draw up a strategic technical plan for its development. Be sure to discuss the risk factors at each stage, and indicate how you would deal with each.The assignment is to answer the question provided above in essay form. This is to be in narrative form and should be as thorough as possible. Bullet points should not to be used. The paper should be at least 1.5 – 2 pages in length, Times New Roman 12-pt font, double-spaced, 1 inch margins and utilizing at least one outside scholarly or professional source related to project management. The textbook should also be utilized. Do not insert excess line spacing.

About the Author

Follow me


{"email":"Email address invalid","url":"Website address invalid","required":"Required field missing"}