• Home
  • Blog
  • Build a Project Charter for American Airlines. Sub- Initiating a project

Build a Project Charter for American Airlines. Sub- Initiating a project

0 comments

Company I chose is American Airlines

Attaching an example for the way you should build this project Charter.

But its an example and will need more detailed version than the example.

and also I need this fields to be well details as per the below instructions.

For ELEVATOR SPEECH

Using exactly one hundred (100) words you will provide an elevator pitch/business case

This assignment should be single-spaced so do not change any of the formatting for this document.

News source (APA reference):

Web address:

City:

Elevator Pitch (100 words exactly):

SCOPE STATEMENT

Draft a two or three sentence scope description for this project.

Provide six (6) key deliverables that are required to consider the project to have been completed successfully. Then state what the Acceptance Criteria entails to consider these Key Deliverables completed. Deliverables and Acceptance Criteria need to follow SMART criteria. That means that these need to be Specific, Measurable, Achievable, Relevant and Timely. This exercise only needs to identify six (6) of the potential Deliverables needed in the project. It does not mean to identify six (6) deliverables to complete the whole project. These Deliverables will be utilized to create a future WBS with Activity List. So again, be specific and utilize SMART criteria.

As an example, if your Project was to build a wooden fence around a field then one of your Key Deliverables would be: Install Fence Posts. The Acceptance Criteria could be: Five-foot fence posts have been installed every eight feet around the field. Posts are properly secured in concrete and plumb. (This could be more specific but this is sufficient for the exercise).

The final step will to be to define and identify Exclusions, Constraints and Assumptions. First, briefly define what these concepts are utilizing material from the weekly reading (textbook) in support of creating your definition. Then identify these items within the scope of your project and explain why these elements have been identified.

WORK BREAKDOWN STRUCTURE WITH ACTIVITY LIST

This should be a checklist of items that need to be completed to ensure that the Deliverable is completed and the Acceptance Criteria is met. SMART criteria must be used. Do not try to identify three (3) Activities to complete the entire Deliverable just provide three (3) that would be part of a potential full list.

* Another example using the construction of a fence around the field from last week:

2. Erect Fence Post (Key Deliverable)

2.1 Dig round hole 3-foot-deep with circumference of two feet

2.2 Fill hole with concrete up to 6″ from top of hole

2.3 Insert 8′- 4” x 4” wooden fence post into the center of the hole leaving 5′ of post above top of hole

2.4 Use level to ensure wooden fence post is plumb

2.5 Once concrete has set fill last 6″ inches of hole with dirt. *

About the Author

Follow me


{"email":"Email address invalid","url":"Website address invalid","required":"Required field missing"}