PLEASE ENSURE YOU READ THE ASSIGNMENT 3 INSTRUCTIONS AND ADDRESS ALL THE CORE QUESTIONS (NOTHING MORE AND NOTHING LESS AS YOU WILL ONLY EARN POINTS WHEN YOU ADDRESS THE ASSIGNMENT QUESTIONS/INSTRUCTIONS.
All updates to your WBS MUST be done in MS Project and the MPP MUST be uploaded in BB in order to earn credits – pdf files will not be accepted. No exception.
I sent out an announcement yesterday contain step by step video instructions on how to update your current WBS to reflect the required Network Diagram format. Listen and apply carefully to earn maximum points
Some tips:
Due this coming Monday by 9 AM and worth 230 points
Build on the project from Assignment 2. This assignment consists of two (2) sections:
- MS Project Exercise – this is the required MPP file
- Project Performance paper
You must submit both sections as separate files for the completion of this assignment. Label each file name according to the section of the assignment for which it is written. Additionally, you may create and / or assume all necessary assumptions needed for the completion of this assignment.
Section 1: MS Project Exercise
Update the project schedule in MS Project to account for the following changes:
1. Develop a network schedule for your project using either the arrow diagramming method or the precedence method. Also, your project schedule should illustrate float/slack for each activity. This is a must!
Section 2: Project Performance Paper
Write a six to eight (6-8) page paper in which you:
2. Summarize your project. Note: Your summary should include, but not be limited to, the project’s key objectives, projected costs and resources, and high-level timeline. READ YOUR THE FEEDBACK I PROVIDED IN PREVIOUS PAPER TO ENSURE YOU ARE PROVIDING THE CORRECT INFORMATION ESPECIALLY WITH PROJECT GOALS AND OBJECTIVES. AVOID LOSING POINTS.
3. Create a responsibility assignment matrix (RAM) for your project, and justify your response. CHECK YOURE EBOOK FOR EXAMPLES!
4. Outline the network schedule for your project. Include a narrative description of your network schedule. DESCRIBE THE NETWORK DIAGRAM FORMAT (START/FINISH DATES, DURATION – IN ESSENCE DECRIBE WHAT YOU SEE IN YOUR NETWORK DIAGRAM.