• Home
  • Blog
  • a time study has determined that the standard time for a job is 5.0 minutes per unit produced.

a time study has determined that the standard time for a job is 5.0 minutes per unit produced.

0 comments

a time study has determined that the standard time for a job is 5.0 minutes per unit produced.  If a worker produced 120 units in an eight-hour day, what would their days’ [ay be of the basis rate was $7 per hour and the premium payment system paid on a 100% basis?

a.  greater than $100

b.  between $75 and $99.99

c.  between $65 and $74.99

d.  between $55 and $64.99

e.  less than $55

About the Author

Follow me


{"email":"Email address invalid","url":"Website address invalid","required":"Required field missing"}